“There are three things I have learned never to discuss with people…religion, politics, and the Great Pumpkin.” Linus from Peanuts.
Author: lenbilen
Retired engineer, graduated from Chalmers Technical University a long time ago with a degree in Technical Physics. Career in Aerospace, Analytical Chemistry, computer chip manufacturing and finally adjunct faculty at Pennsylvania State University, taught just one course in Computer Engineering, the Capstone Course.
Stage 9 ended up in the Round Mountain Rockhound Reservoir. The dam is 400 feet high and will top out at 5360 feet with a maximum water level at 5350 feet. This is the western high point in the Transcontinental aqueduct. Stage 10 and forward will deliver peak energy when possible. This stage can deliver peak energy only 5 hours a day, or deliver the day’s worth of peak energy whenever called for. To make this possible there will be a tunnel and pumping station capable of delivering up to 95,000 cfs when called for. The drop is maximum (5410 – 3690 – 13×2.2) = 1702 feet and minimum (5300 – 4000 -13×2.2) = 1272 feet with an average of 1500 feet, delivering 11.5 GW of pumped hydro-storage peak power for 5 hours a day.
The tunnel to the Cove Tank reservoir is 13 miles long and the power station is somewhere in the tunnel’s path. The pumps are not reversible. The Cove Tank Reservoir dam is 1 mile wide and 250 feet high, containing 60,000 acre-ft of water, enough for 7.5 hrs of filling it at 95,000 cfs, or maximum flow capacity of this stage.
Back in 2012 the Greenland ice sheet had an unprecedented melt, and the prediction was that all the Arctic ice would be melted in September of 2015, having reached the Climate tipping point from which there is no return to a normal climate unless we reorganized society into a more totalitarian global governance.
Well, the tipping point didn’t happen, so hopefully global governance will not happen either’ even many are trying.
These are the latest charts for arctic temperatures, ice and snow for Jan 11:
Notice the temperature has been below normal for the first half of the melting season.
The icepack on Greenland has barely started melting during the melting season
Notice the difference between this year and 2012
And yesterday’s snowfall over Greenland
Notice, Greenland only melts at the edges, the ice pack is always frozen
Remember, H2O is a condensing gas, when cooled off it condenses into clouds.
Clouds cool by day and warm by night, a one percent difference in cloud cover means more than the increase in CO2.
The only place this doesn’t work is in deserts. Forget CO2, but let us not make any more deserts.
Romans 2. Paul pointed out that you have no excuse, God’s judgement is righteous, Jews and Gentiles are equally guilty, and circumcision is of no avail.
Nehemiah 9. The people did confess their sins and recited Israel’s miraculous history.
Nehemiah 10 lists the people who sealed the covenant and its content.
Stage 8 went from Arch Lewis Canyon Lake to Martin Tank Lake. The Martin Tank Lake dam is 22260 feet wide and 230 feet high. The Lake will contain about 30,000 Acre-ft when full, about eighteen hours worth of storage.
The elevation at the Martin Tank lake will top out at 4620 feet with maximum water level at 4610 feet. The aqueduct will first descend to 3980 feet, as it crosses the Rio Grande in La Mesa, a distance of 50 miles. The elevation difference is (4620 – 3980 – 50 X 2.2) feet = 530 feet. Releasing 24,000 cfs of water 530 feet will generate 1 GW of energy for 19 hrs/day. From La Mesa it will climb to the Round Mountain Rockhound Reservoir. The dam is 400 feet high and will top out at 5360 feet with a maximum water level at 5350 feet. The total lift of the water in stage 9 is (5350 – 3980 + 160×2.2) feet = 1722 ft. To lift 24,000 cubic feet per second 1722 feet requires seven 500 MW LFTR nuclear reactors, . T he Round Mountain Rockhound Reservoir will contain about 40,000 Acre-ft of water when full, about one day of storage. For 5 hours per day these seven reactors used in this stage can provide 3.5 GW of peak power to the grid instead of pumping water, thus acting as a virtual hydroelectric peak power storage. The Round Mountain Rockhound Reservoir will look like this:
Romans 1:18-32 Paul explained how the wrath of God was to come on mankind because they “changed the truth of God into a lie, and worshipped and served the creature more than the Creator.”
Nehemiah 6. There arose a conspiracy against Nehemiah, but he was on to them and managed to get the wall completed.
Nehemiah 7. Finally the wall was finished, and the chapter gives a list of the captives who returned to Jerusalem.
Nehemiah 8. Ezra read the Law and the returnees celebrated the Feast of Tabernacles.
Romans 1:1-17 starts with an eloquent greeting to all in Rome, and it is just as valid for us today as it was then. Paul longed to visit Rome and impart scriptural spiritual wisdom, such as “the Just shall live by Faith.”
Nehemiah 4. Through strong opposition the building of the wall was defended.
Nehemiah 5. Nehemiah encountered oppression but showed great generosity.
Psalm 54 , of David. A short prayer with conviction that God is David’s helper.
Stage 8 ended in Arch Lewis Lake. It will be filled mostly during the 5 hours of peak power generation. During the other 19 hours the fill rate will be very low leading to lowering water levels.
It has a 3000 feet wide and up to 480 feet high dam, topping out at 4620 feet, and the lake holds a volume of up to 60,000 acre-ft of water.
From the Arch Lewis Lake dam to the Martin Tank Lake the distance is 60 miles the way the aqueduct takes. It will first descend to 3720 feet before rising to 5190 feet. The descending drop is (4620 – 3720 – 2.2 x 9), or up to 890 feet. The Martin Canyon Lake will top out at 5200 feet with maximum water level at 5190 feet. The total lift of the water in this stage is (5190 – 3720 + 51×2.2) feet = 1582 ft. To lift 25,000 cubic feet per second (1582 x 1.03 – 890 x 0.97) = 766 feet requires three 500 MW LFTR nuclear reactors plus the use of 80 MW from the grid. The Martin Tank Lake dam is 22260 feet wide and 230 feet high. It will contain about 30,000 Acre-ft when full, about eighteen hours worth of storage. For 5 hours per day the three reactors can provide 1.5 GW of peak power to the grid.
Acts 28 records Paul’s ministry on Malta and his final sailing to Rome. After Paul arrived in Rome it tells of Paul’s ministry there, and he stayed there two full years.
Nehemiah 2. After some days of praying Nehemiah went to the King, told the King why he was sad and was sent to Judah where he viewed the wall of Jerusalem.
Nehemiah 3 retells the start of rebuilding the wall.
Dam 1 dams the White Oaks Canyon Lake. It has a 2000 feet wide and up to 400 feet high dam, topping out at 5000 feet, and the lake holds a volume of up to 80,000 acre-ft of water.
Dam 2 dams the Last Chance Canyon Lake. It has a 2200 feet wide and up to 380 feet high dam, topping out at 5680 feet, and the lake holds a water volume of up to 35,000 acre-ft.
The Stage 7 is a tunnel, starting at 4600 feet and ending at 4492 feet maximum levels. The 20 mile long tunnel will drop 88 feet as it passes under the mountain.
Dam 3 dams the Upper Canyon Lake for lack of a better word. It has a 1600 feet wide and up to 240 feet high dam, topping out at 5200 feet, and the lake holds a volume of up to 15,000 acre-ft of water.
Dam 4 dams the Arch Lewis Canyon Lake for lack of a better word. It has a 3000 feet wide and up to 480 feet high dam, topping out at 4600 feet, and the lake holds a volume of up to 60,000 acre-ft of water.
Up to now all stages have pumped water up the mountains. This stage releases the hydroelectric water storage, and it does so even during peak power, so the water flows all 24 hours with peak electricity creation during peak usage. By now, the average flow is down to 19000 cfs , 24 hours a day. During off peak hours, 19000 cfs flows down the tunnel, the power generated is coming from Dam 1 with a water level of between 4980 feet and 4700 feet with an average of 4940 feet. The maximum output level of the water is 4640 feet, so a drop of 300 feet will generate a minimum of 450 MW of power, or 8.6 GWh/day. Part of this energy will be used to pump up the water to Dam 2 and 3. Dam 2 will pump 13,000 cfs of water from 4630 feet to between 5820 feet ans 5520 feet, (average 5760) for 19 hours, an average lift of 1,060 feet. This required a total of 6.2 GWh of energy per day , or 326 MW pf power. Dam 3 will pump 6,000 cfs of water from 4630 feet to between 5200 feet and 4930 feet, (average 5120) for 19 hours, an average lift of 520 feet. This required a total of 1.4 GWh of energy per day , or 74 MW pf power.
The net electricity generated during 19 off peak hours is 1.0 MW on average. The electricity generated during the 5 peak hours is 49,000 cfs at a drop of 1060 feet, or 1.16 GW, from dam 2. From dam 3 it will be 22,800 cfs at a drop of 520 feet, or 264 MW. From the 2 dams , total electricity is 1.42 GW. Total electricity generated during these 5 hours is 7.12 GWh. This assumes a 97% efficiency of the reversible pumps from Dam 2 and 3. The pumps from Dam 1 are not reversible.
The tunnel capacity between Dam 1 and Dam 2 outlets is 19,000 cfs, between Dam 2 and 3 it is 49,000 cfs, and from Dam 3 to its exit in Dam 4 it is 71,800 cfs.
Acts 27:13-44. Against better advice from God via Paul the captain and Centurion ignored Paul’s warning, and sure enough a great storm grew up and they were shipwrecked on Malta, but all got safely ashore.
Proverbs 9 contrasts the way of wisdom with the way of folly.
Psalm 51, of David, written after Nathan confronted David after his adultery with Bathsheba. This Psalm explains fully, how God would say, after David was pointed out to be both an adulterer and a murderer: “He was a man after God’s own heart”.
Psalm 52, of David. The Psalm is a contemplation of David, contrasting the final end of evil men with the rewards of the righteous.
Psalm 53. This is a short Psalm telling about fools that say “No God”