March 24: Reading the Holy Bible in a year.

Matthew 27:32-66,  After Jesus was flogged he was too weak to carry his own cross, so the Roman soldiers forced Simon from Cyrene to carry Jesus cross all the way to the place of the skull, and there Jesus was crucified together  with two criminals. To identify Jesus they put an  inscription on the top of the cross: “This is Jesus, the King of the Jews.” A number of prophecies were fulfilled during the crucifixion, and Jesus died on the cross. At that very moment the Temple veil was torn in two, from top to bottom and for the first time the holy of holiest was revealed. Jesus, now being dead was taken down from the cross and put in a tomb, a stone was rolled in front of the entrance and the tomb was sealed, and – this is important, they put up a guard to secure the tomb. Why did they do that? Think about that.

Deuteronomy 30, The Blessings of turning to God is pro-life, but if not, God is pro-choice with all its consequences.  See v 15:   “I have set before thee this day life and good, and death and evil“. (KJV)

Deuteronomy 31 Moses declared Joshua to be the new leader of Israel, “Be strong and of good courage”. The Law was to be read every seven years, Israel’s rebellion was predicted and, as a reminder Moses recorded his song, which is recited in the next chapter.

Leg 7 of the Transcontinental aqueduct. From the Buffalo Soldier Draw dam to the White Oaks Canyon dam and pumped storage power plant.

Leg 7 of the Transcontinental aqueduct is 90 mils in Texas, rising from 2800′ to 3640′. From there it flows 115 miles in New Mexico rising to 5200′.

The upper dam of Soldier Mountain Draw, capacity 40,000 acre-ft.

The elevation at the buffalo Soldier Draw dam will top out at 2,850 feet with maximum water level at 2,830 feet. The White Oaks Canyon dam is 560 feet high and will top out at 5,240 feet with an average water level at 5,000 feet. The total lift of the water in stage 5 is (5,000 – 2,800 + 205×2) feet = 2610 ft. To lift 21,600 cubic feet per second 2610 feet requires fifty 100 MW LFTR nuclear reactors, twenty on the Texas Grid and thirty on the Western national grid. The White Oaks Canyon Lake will contain about 130,000 Acre-ft of water when full, about three days of storage. For 5 hours per day these fifty reactors used in this stage can provide 5.0 GW of peak power to the grid instead of pumping water, thus acting as a virtual hydroelectric peak power storage. 2 GW of this will be used by the Texas Power Grid, and 3 GW by the Western U.S. Power grid, and they have to be coordinated.The White Oaks dam will look like this:

What’s in it for Texas? Wind power is already 22% of the source for the Texas power grid, but Texas has up to now no pumped water storage, and until this is fixed coal and natural gas backup must be provided when the wind doesn’t blow. This leg will provide 2 GW of virtual hydro-power generation to the Texas power grid by not pumping water for up to 5 hours and thus provide 10 GWh of peak power daily. This will greatly help stabilize the Texas power grid, and facilitate the phasing out of coal power and help the transition to electric vehicles, which will add stress to the stability of the grid by their uneven recharging patterns.

What’s in it for New Mexico? This leg will provide 3 GW of virtual hydro-power generation by not pumping water for up to 5 hours and thus provide 15 GWh of peak power daily.

March 23: Reading the Holy Bible in a year.

Matthew 27:1-31 depicts the first half of the longest day, beginning with Jesus being handed over to Pilate, the Roman governor; since the Jews did not have right to execute capital punishment. Judas hanged himself and the thirty pieces of silver given him in exchange for the betrayal of Jesus was used to buy the Potter’s field. Pilate tried to wiggle out of his role as judge; his wife had warned him, so he used his privilege to release one prisoner at Passover which was the custom at that time. Pilate chose Jesus or Barabbas to be released and of the two the people chose Barabbas; a known insurrectionist to be released and Jesus to be crucified. Pilate acquiesced to the mob and so Jesus was flogged by the soldiers for a public spectacle and then he was led away to be crucified.

Deuteronomy 29. In preparation of the tribes entering the promised land God renews the Mosaic Covenant in Moab.

Leg 6 of the Transcontinental aqueduct. From Deadman Draw dam and pumped storage power plant to Buffalo Soldier Draw dam and optional pumped storage plant.

This leg has the freedom to pump water at 21,800 cfs or less, including stopping for up to 5 hrs/day to provide virtual peak hydro-power for the Texas grid. This must be coordinated with leg 5 and leg 7. Total distance of the aqueduct is 135 miles, from elevation 1830′ to elevation to 2840′.

From Deadman Draw dam to Buffalo Soldier Draw dam, a distance of 135 miles.

The water elevation at Deadman Draw dam is nominally 1,830 feet. The Buffalo Soldier Draw dam yet to be built will top out at 2,850 feet with maximum water level at 2,840 feet. The total lift of the water in stage 3 is (2,840 – 1,830 + 135×2) feet = 1,280 ft. To lift 21,800 cubic feet per second 1,280 feet requires twenty-five 100 MW LFTR nuclear reactors The upper reservoir will contain about 40,000 Acre-ft when full, about one day worth of storage. For 5 hours per day these twenty-five 100 MW reactors can provide 2.5 GW of peak power to the grid.

There will be a lower dam to provide hydroelectric power storage of 4.5 GWh, or 900 MW for 5 hours. After each use the lower dam will be re-emptied by pumping back the water to the upper dam, using 5.4 GWh of power, hopefully using surplus wind or solar power.

The aqueduct will go thru and dug sown at 1590’elevation

What’s in it for Texas? Wind power is already 22% of the source for the Texas power grid, but Texas has up to now no pumped water storage, and until this is fixed coal and natural gas backup must be provided when the wind doesn’t blow. This leg will provide 4.5 GWh of peak power per day from the pumped water storage. In addition the 2.3 GW of Nuclear power can provide virtual hydro-power generation by not pumping water for up to 5 hours and thus provide 6 GWh of peak power daily. This will greatly help stabilize the Texas power grid, and facilitate the phasing out of coal power and help the transition to electric vehicles, which will add stress to the stability of the grid by their uneven recharging patterns. I addition, the City of Lubbock can purchase water from the aqueduct, to be negotiated.

March 22: Reading the Holy Bible in a year.

In Matthew 26:31-75 Jesus predicted Peter’s denial. After finishing the Last Supper they all moved on to the Mount of Olives, and there was the garden of Gethsemane. In the garden Jesus prayed “Not my will, but yours be done.”  Jesus prayed this prayer three times, and every time the disciples fell asleep. After that is recorded the betrayal and arrest of Jesus as he was taken to the Sanhedrin to be interrogated. The chapter ends with Peter’s denial.

Deuteronomy 28. The LORD through Moses specified many blessings for obedience and even more curses for disobedience.

Leg 5 of the Transcontinental aqueduct. From Brad dam to Deadman Draw dam and pumped storage power plant.

The distance of leg 5 is 10 miles of water and 60 miles of aqueduct. This leg has the freedom to pump water at 22,000 cfs or less, including stopping for up to 5 hrs/day to provide virtual peak hydro-power for the Texas grid.

The elevation at Brad reservoir is nominally 1260 feet. From 25 miles East of Breckenridge the aqueduct goes W to 19.5 miles ENE of Abilene, a distance of 60 miles . The dam yet to be built will top out at 1840 feet with maximum water level at 1830 feet. The total lift of the water in stage 3 is (1830 – 1260 + 60×2) feet = 690 ft. To lift 22,000 cubic feet per second 690 feet requires twelve 100 MW LFTR nuclear reactors The upper Baird reservoir will contain about 90,000 Acre-ft when full, about two days worth of storage. For 5 hours per day these twelve 100 MW reactors can provide 1.2 GW of peak power to the grid. There will be a lower dam to provide hydroelectric power storage of 4 GWh, or 800 MW for 5 hours. After each use the lower dam will be re-emptied by pumping back the water to the upper dam, using 4.75 GWh of power, hopefully using surplus wind or solar power.

b

What’s in it for Texas? Wind power is already 22% of the source for the Texas power grid, but Texas has up to now no pumped water storage, and until this is fixed coal and natural gas backup must be provided when the wind doesn’t blow. This leg will provide 4 GWh of peak power per day from the pumped water storage. In addition the 1.2 GW of Nuclear power can provide virtual hydro-power generation by not pumping water for up to 5 hours and thus provide 6 GWh of peak power daily. This will greatly help stabilize the Texas power grid, and facilitate the phasing out of coal power and help the transition to electric vehicles, which will add stress to the stability of the grid by their uneven recharging patterns.

March 21: Reading the Holy Bible in a year.

Matthew 26:1-30 is very important. It begins with the plot against Jesus, continuing with his anointing at Bethany, then Judas agreeing to betray Jesus for thirty pieces of silver, continuing with the Lord’s supper being initiated, and Jesus predicting who is going to betray him.

Deuteronomy 25 tells of the marriage duty of a surviving brother, how to weigh with honest measures, and, totally unrelated; do not forget to destroy the Amalekites.

Deuteronomy 26 shows the regulations for offerings of firstfruits and tithes. Follow the LORD’s commands, you are a special people of God.

Deuteronomy 27 specifies that the Law should be inscribed on large stones on Mount Ebal. There six tribes shall declare curses, and on Mount Gerizim six tribes shall pronounce blessings.

Leg 4 of the Transcontinental Aqueduct. From Lake Ray Roberts to the Brad Dam (to be built).

Leg 4 of the Transcontinental aqueduct is 15 miles of lake and 100 miles of aqueduct.

Lake Ray Roberts, elevation 625′, must be kept nearly constant.

The elevation at Lake Ray Roberts is 625 feet. From here the aqueduct goes WSW to the Brad dam. It crosses the Brazos river, but does not interfere with it. (This can change if desired). The Brad dam is located just south of the Brad Cemetery on U.S. route 180, 25 miles East of Breckenridge. The dam, yet to be built will top out at 1280 feet with maximum water level at 1270 feet. The total lift of the water in stage 2 is (1,260 – 625 + 100×2) feet = 835 ft. To lift 22,000 cubic feet per second 835 feet requires seventeen 100 MW LFTR nuclear reactors. Lake Brad will contain about 60,000 Acre-ft when full, about one and a half day’s worth of storage. For 5 hours per day these 17 reactors can provide 1.7 GW of peak power to the grid. (The power can also partly be provided by wind power, during which time the LFTR’s can make hydrogen for extra peak power storage).

What’s in it for Texas? The 1.7 GW of Nuclear power can provide virtual hydro-power generation by not pumping water for up to 5 hours and thus provide 8.5 GWh of peak power daily. This has to be done in conjunction with Leg 3.

March 20: Reading the Holy Bible in a year.

Matthew 25: 31-46. Jesus will return to judge the nations, to illustrate how he told the parable of the sheep and the goats, and the sheep were defined as those who do God’s will “You did it for me.”

Deuteronomy 22 contains more instructions, protect your brother’s property, the LORD detests unisex clothing, protect nesting birds, do not yoke an ox and a donkey together. The chapter ends with various laws on sexual morality.

Deuteronomy 23 deals with shunning and exclusion from the assembly, how to deal or not to deal with certain foreigners. Make your relief stations outside the camp and do what you have to do and keep proper camping cleanliness. No harlots allowed and do not accept offerings from them. You may not charge interest to a fellow Israelite, but you can be a Shylock to a foreigner. If you make a vow to the Lord, you better fulfill it!

Deuteronomy 24 tells of divorce laws and limitations for remarriage, leprosy, lending laws, how to properly pay workmen, and after harvest please leave the gleanings.

Leg 3 of the Transcontinental aqueduct. From the Eufaula Dam to Ray Roberts Lake.

Stage 3 consists of 40 miles on Lake Eufaula, 10 miles on Aquila lake and 125 miles of a 22,000 cfs aqueduct, 95 miles in Oklahoma and 30 miles in Texas. This segment should ideally have used lake Texoma, but the water in it is brackish with between one half to one percent salinity, so it is unusable for drinking water, and even for agricultural purposes.

It starts out at lake Eufaula:

Conservation pool elevation 585′

From there the real aqueduct will start, unencumbered by barge traffic regulation. It will go from the southern tip of Lake Eufaula to lake Atoka, a distance of 40 miles. Lake Atoka is 10 miles long.

Lake Atoka elevation is 590′

Then from Lake Atoka it will pass by lake Texoma on ther downslope of thee Denison dam at an elevation of 640′. From there it will go to Lake Ray Roberts

Leg 3 total length 50miles lake, 125 miles aqueduct, end point Lake Ray Roberts, elevation 625′

The elevation at lake Atoka is about 590′. The aqueduct will have a capacity of 22,000 cfs, and it will climb from Eufaula to about 740′ before going down again to lake Atoka. From lake Atoka it will only pump up water for 85 miles. The aqueduct water level drops by 2′ per mile. Total pumping up will be 365′ and going down water release will be 110′ The total power need for this stage will be up to 665 MW assuming 92% pumping and generation efficiency. three 200 MW LFTR SMR will take care of the power needs this stage, and can be used for peak power generation when pumping is temporarily shut off. It is important to keep the water level steady at Lake Ray Roberts.

What’s in it for Oklahoma? Eufaula lake flood control will be greatly enhanced. Lake Atoka flood control will be enhanced and in case of drought extra water will be supplied to keep lake levels steady. There will be about 200 MW virtual hydro-power energy provided for up to 5 hours/day to stabilize the grid with peak power.

What’s in it for Texas? In case of drought Lake Ray Roberts can supply extra water to the Dallas area. The water levels will be stabilized at Lake Ray Roberts. There will be about 400 MW virtual hydro-power energy provided for up to 5 hours/day to stabilize the Texas grid with peak power.