The Transcontinental Aqueduct. Leg 11: Cove Tank Reservoir to San Carlos Lake, a distance of 70 miles.

Stage 10 was a true pumped hydro-storage peak power stage, producing up to 11.5 GW electric power for up to 5 hours a day. In stage 11 the flow will be a maximum flow of up to 25,000 cfs, but with periods of less flow during low electricity demand, all to accommodate both water needs and power demands.

The Cove Tank Reservoir dam is 1 mile wide and 250 feet high, the top of the dam is at 4,000 feet. containing up to 60,000 acre-ft of water, enough storage for more than a day’s flow.

The Cove tank Reservoir starts out nearly empty when peak power demand starts, and is rapidly filling up until peak demand ends

The power generating drop is on average (3800 – 2535 – 70×2.2) = 1,111 feet. This stage is capable of generating maximum 2.2 GW of power during peak power demand, adjusted down at low power demand to not exceed the daily water supply.

San Carlos lake is located within the 3,000-square-mile (7,800 km2) San Carlos Apache Indian Reservation, and is thus subject to tribal regulations. It has been full only three times, in 1993 it overflowed the spillway and about 35,000 cfs of water caused erosion damage to natural gas pipelines. The lake contains now (April 6,2021) less than 100 acre-ft of water. All fish is dead.

When former President Coolidge dedicated the dam in 1930, the dam had not begun to fill. Humorist Will Rogers looked at the grass in the lake bed, and said, “If this were my dam, I’d mow it.”[

When the Transcontinental aqueduct is built the lake will always be nearly filled, with flood control nearly automatic, it will never overflow, and it will look like this:

The San Carlos lake, when filled will hold 1,000,000 acre-ft of water.

The Coolidge dam will have to be retrofitted for a 25,000 cfs water flow

July 14: Read through the Holy Bible in a year.

Romans 3 is full of memorable quotations: “let God be true, but every man a liar.” It speaks of God’s faithfulness and God’s Judgment, “As it is written, There is none righteous, no, not one” , “ For all have sinned, and come short of the glory of God,“and “Therefore we conclude that a man is justified by faith without the deeds of the law,” just to name a few. Read them all, and marvel.

Nehemiah 11 lists the people of Jerusalem and the people outside Jerusalem.

Psalm 55, of David. When treacherous friends and a multitude of enemies attacked, David still trusted God.

The Transcontinental Aqueduct. Leg 10: Round Mountain Rockhound Reservoir to Cove Tank Reservoir, a distance of 13 miles.

Stage 9 ended up in the Round Mountain Rockhound Reservoir. The dam is 400 feet high and will top out at 5360 feet with a maximum water level at 5350 feet. This is the western high point in the Transcontinental aqueduct. Stage 10 and forward will deliver peak energy when possible. This stage can deliver peak energy only 5 hours a day, or deliver the day’s worth of peak energy whenever called for. To make this possible there will be a tunnel and pumping station capable of delivering up to 95,000 cfs when called for. The drop is maximum (5410 – 3690 – 13×2.2) = 1702 feet and minimum (5300 – 4000 -13×2.2) = 1272 feet with an average of 1500 feet, delivering 11.5 GW of pumped hydro-storage peak power for 5 hours a day.

The tunnel to the Cove Tank reservoir is 13 miles long and the power station is somewhere in the tunnel’s path. The pumps are not reversible. The Cove Tank Reservoir dam is 1 mile wide and 250 feet high, containing 60,000 acre-ft of water, enough for 7.5 hrs of filling it at 95,000 cfs, or maximum flow capacity of this stage.

The Arctic ice sheet and Greenland ice is doing quite well, thank you. A Limerick.

The ice in the Arctic will stay

In Greenland it snowed every day

New white snow, what a sight!

Reflects back all the light

No tipping point here, this i say.

Back in 2012 the Greenland ice sheet had an unprecedented melt, and the prediction was that all the Arctic ice would be melted in September of 2015, having reached the Climate tipping point from which there is no return to a normal climate unless we reorganized society into a more totalitarian global governance.

Well, the tipping point didn’t happen, so hopefully global governance will not happen either’ even many are trying.

These are the latest charts for arctic temperatures, ice and snow for Jan 11:

Notice the temperature has been below normal for the first half of the melting season.

The icepack on Greenland has barely started melting during the melting season

Notice the difference between this year and 2012

And yesterday’s snowfall over Greenland

Notice, Greenland only melts at the edges, the ice pack is always frozen

Remember, H2O is a condensing gas, when cooled off it condenses into clouds.

Clouds cool by day and warm by night, a one percent difference in cloud cover means more than the increase in CO2.

The only place this doesn’t work is in deserts. Forget CO2, but let us not make any more deserts.

July 13: Read through the Holy Bible in a year.

Romans 2. Paul pointed out that you have no excuse, God’s judgement is righteous, Jews and Gentiles are equally guilty, and circumcision is of no avail.

Nehemiah 9. The people did confess their sins and recited Israel’s miraculous history.

Nehemiah 10 lists the people who sealed the covenant and its content.

The Transcontinental Aqueduct. Leg 9: Martin Tank Lake to Round Mountain Rockhound Reservoir, a distance of 210 miles.

Stage 8 went from Arch Lewis Canyon Lake to Martin Tank Lake. The Martin Tank Lake dam is 22260 feet wide and 230 feet high. The Lake will contain about 30,000 Acre-ft when full, about eighteen hours worth of storage.

The elevation at the Martin Tank lake will top out at 4620 feet with maximum water level at 4610 feet. The aqueduct will first descend to 3980 feet, as it crosses the Rio Grande in La Mesa, a distance of 50 miles. The elevation difference is (4620 – 3980 – 50 X 2.2) feet = 530 feet. Releasing 24,000 cfs of water 530 feet will generate 1 GW of energy for 19 hrs/day. From La Mesa it will climb to the Round Mountain Rockhound Reservoir. The dam is 400 feet high and will top out at 5360 feet with a maximum water level at 5350 feet. The total lift of the water in stage 9 is (5350 – 3980 + 160×2.2) feet = 1722 ft. To lift 24,000 cubic feet per second 1722 feet requires seven 500 MW LFTR nuclear reactors, . T he Round Mountain Rockhound Reservoir will contain about 40,000 Acre-ft of water when full, about one day of storage. For 5 hours per day these seven reactors used in this stage can provide 3.5 GW of peak power to the grid instead of pumping water, thus acting as a virtual hydroelectric peak power storage. The Round Mountain Rockhound Reservoir will look like this:

July 12: Read through the Holy Bible in a year.

Romans 1:18-32 Paul explained how the wrath of God was to come on mankind because they “changed the truth of God into a lie, and worshipped and served the creature more than the Creator.

Nehemiah 6. There arose a conspiracy against Nehemiah, but he was on to them and managed to get the wall completed.

Nehemiah 7. Finally the wall was finished, and the chapter gives a list of the captives who returned to Jerusalem.

Nehemiah 8. Ezra read the Law and the returnees celebrated the Feast of Tabernacles.

July 11: Read through the Holy Bible in a year.

Romans 1:1-17 starts with an eloquent greeting to all in Rome, and it is just as valid for us today as it was then. Paul longed to visit Rome and impart scriptural spiritual wisdom, such as “the Just shall live by Faith.

Nehemiah 4. Through strong opposition the building of the wall was defended.

Nehemiah 5. Nehemiah encountered oppression but showed great generosity.

Psalm 54 , of David. A short prayer with conviction that God is David’s helper.

The Transcontinental Aqueduct. Leg 8: Arch Lewis Canyon Lake to Martin Tank Lake, a distance of 50 miles.

Stage 8 ended in Arch Lewis Lake. It will be filled mostly during the 5 hours of peak power generation. During the other 19 hours the fill rate will be very low leading to lowering water levels.

It has a 3000 feet wide and up to 480 feet high dam, topping out at 4620 feet, and the lake holds a volume of up to 60,000 acre-ft of water.

From the Arch Lewis Lake dam to the Martin Tank Lake the distance is 60 miles the way the aqueduct takes. It will first descend to 3720 feet before rising to 5190 feet. The descending drop is (4620 – 3720 – 2.2 x 9), or up to 890 feet. The Martin Canyon Lake will top out at 5200 feet with maximum water level at 5190 feet. The total lift of the water in this stage is (5190 – 3720 + 51×2.2) feet = 1582 ft. To lift 25,000 cubic feet per second (1582 x 1.03 – 890 x 0.97) = 766 feet requires three 500 MW LFTR nuclear reactors plus the use of 80 MW from the grid. The Martin Tank Lake dam is 22260 feet wide and 230 feet high. It will contain about 30,000 Acre-ft when full, about eighteen hours worth of storage. For 5 hours per day the three reactors can provide 1.5 GW of peak power to the grid.

July 10: Read through the Holy Bible in a year.

Acts 28 records Paul’s ministry on Malta and his final sailing to Rome. After Paul arrived in Rome it tells of Paul’s ministry there, and he stayed there two full years.

Nehemiah 1 records Nehemiah’s prayer.

Nehemiah 2. After some days of praying Nehemiah went to the King, told the King why he was sad and was sent to Judah where he viewed the wall of Jerusalem.

Nehemiah 3 retells the start of rebuilding the wall.